LT CUAJIMALPA. CONTRACT RRCE-C0-07-16
Construction of civil and electromechanical work of the crossing with the LT Cuajimalpa – Aguilas of 230 kV – 2c – 0-5 km – 1113 ACSR/As – 1 c/f – Ta/Pa, includes supply and dismounting. Work located in the delegation of Cuajimalpa, Mexico City.
Ubicación: México, Estado de México
Fecha de inicio: January 16, 2017
Fecha de terminación: June 15, 2017

PROJECT “SIEPAC LOTE 1 – HONDURAS”. CONTRACT No. EPR/CCL-01-L/1
Engineering, supply, construction of civil and electromechanical work, procurement of staff, tests and commissioning of the lines that are part of the project Siepac – Lote 1 – Pais Honduras, consisting of 270 km of lines at 230 kV, double circuit.
Ubicación: Centroamérica, Honduras,
Fecha de inicio: July 1, 2006
Fecha de terminación: April 1, 2009

PROJECT “ANILLO PACIFICO SUR”. CONTRACT C040
For the transmission lines at 230 kV that form the South Pacific Ring in Guatemala. (Partial) engineering and construction of 99 km of transmission lines at 230 kV, double circuit.
Ubicación: Centroamérica, Guatemala,
Fecha de inicio: April 1, 2015
Fecha de terminación: September 30, 2016

ENLARGEMENT OF TH SE CALERA II
Execution of the engineering, supply, construction and preoperational tests of the enlargement of a substation of 230 kV, located in the state of Zacatecas, including: supply of a three-phase autotransformer of 75/100 MVA with nominal voltages of 230/115/13.8 kV, transfer bay, relocation of reactor R1 and Auxiliary Services 13.8 kV of the tertiary, recalibration of buses in zone 115 kV and 230 kV.
Ubicación: México, Zacatecas
Fecha de inicio: January 23, 2017
Fecha de terminación: August 20, 2018

SE MANIOBRAS SET2. CONTRACT No. RRCE-171005
Construction of the civil and electromechanical work of the S.E. Maniobras Set2 to feed the traction substation of the project Tren Interurbano Toluca – Valle de Mexico, located in the kilometer 21+550 of the Autopista Mexico – Toluca, Mexico City. Consists of a new substation of the encapsulated type (insulated in Sf6) with a bus arrangement of 230 kV of main bus – auxiliary bus with breaker consisting of: two feeders in 230 kV for the transmission lines that connect this substation with the substations San Bernabe and Contreras, two feeders in 230 kV for the transmission lines that connect this substation with the substation of Maniobras del Tren 2.
Ubicación: México, Ciudad de México
Fecha de inicio: April 3, 2017
Fecha de terminación: July 6, 2018

SE Y LT SEDENA. CONTRACT No. RRSE-SDN-C0-02-17
Construction of the civil and electromechanical work including the partial supply of the LT Central Generadora – Maniobras (115kV-1c-6.5 km – 795 ACSR/As-cgfo 36 – pa), complement of civil and electromechanical work, partial supply and preoperational tests of the SE Elevadora (1t-3f-20 MVA-34.5/115 kV-2/1/0a) and electromechanical work for the construction of the underground TL of 34.5 kV in the wind farm, located in the state of Oaxaca.
Ubicación: México, Oaxaca
Fecha de inicio: April 15, 2017
Fecha de terminación: October 31, 2017