PROJECT “292 SE 1701 SUBSTATION CHIMALPA DOS”

Construction and installation of 2 (two) transmission lines with voltage of 230 and 400 KV and a total length of 19.4 km-c, located in the state of State of Mexico. Includes activities of engineering, supply, construction and tests.