PROJECT 1601: 262 SLT 1601 TRANSMISION Y TRANSFORMACION NOROESTE – NORTE (1A. FASE). CONTRACT No. PIF-005/2012

Engineering, procurement of materials and permanent installation equipments, training, construction and commissioning of 3 (three) transmission lines with voltages of 230 and 115 kV and a total length of 29.2 km-c and 2 (two) substations with voltages of 230 and 115 kV, with 133.3 MVA, 18 MVAr and 5 (five) feeders, located in the state of Chihuahua.

  • LT Lopez Mateos – San Pedro Potencia. 230 kV, 1 circuit, self-supported towers, 21.3 km-l, 21.3 km-c, ACSR/As 1113, one conductor per phase.
  • LT San Pedro Potencia Entq. Cm San Pedro – Basaseachic. 115 kV, 2 circuits, self-supported towers, 3.7 km-l, 7.4 km-c, ACSR/As 477, one conductor per phase.
  • LT San Pedro Potencia Entq Cm Sand Pedro – Creel. 115 kV, 1 circuit, self-supported towers, 0.5 km-l, 0.5 km-c, ACSR/As 477, one conductor per phase.
  • SE San Pedro Potencia Bco. 1. 1t-3f-100 MVA 230/115 kV 1/3; 1 at 230 kV LT Cuauhtemoc II; 1 at 115 kV LT CM San Pedro; 1 at 115 kV LT Basaseachi; 1 at 115 kV LT Creel; 1 reactor 18 MVAr in 13.8 kV to be installed in the tertiary of the transformation bank.
  • SE Cuauhtemoc II Ampl. 1 at 115 kV LT San Pedro Potencia.