Electrical substations

Close

Solicita Más Información

Llena los campos descritos en la parte inferior y nos pondrémos en contacto.




México – Veracruz

COMMUNICATIONS. CONTRACT NO. 800183909

Supply, Installation and Commissioning of Fiber Optic Cable Type ADSS and OPGW (12 and 36 fibers), Includes Hardware and Accessories for installation: 43.45 Km in Tamarindo Line 2 – 73820 – Trancas; 2.50 Km. Veracruz Line 2 – 93960 – Laguna Verde; 8.40 Km. El Castillo Line – 73260 – Las Trancas; 4 Km in Line Tamarindo 2 – 73380 – Cardel.

Start Date: 09-nov-04
Final Date: 08-dec-04

ELECTRICAL SUBSTATION. CONTRACT NO. PIF-017/2009

Project Development, Engineering, Procurement, Supply, Construction, Training and Commissioning of 9 lines of 400, 230 and 115 kV and a length of 196.1 Km-C (LT Garden – Veracruz II 115 kV-2.2 Km-C, LT Garden-Infonavit 115 kV-1.3 Km-C, LT Green Lagoon – Jamapa 400 kV-173.8 Km-C, LT Jamapa entq Veracruz II – Temascal II L1 230 kV-5 Km-C, LT Jamapa entq. Garden – Temascal II L2 230 kV-5.2 Km-C, LT Garden – Las Brisas 115 kV-2.4 Km-C, LT Garden – JB Lobos 115 kV-4.5 Km-C, LT Paso del Toro ent. Veracruz II – Amatlan II 230 kV-5.6 Km-C), and 6 substations with 400, 230 and 115 kV ballasts with a capacity of 1175 mVA, 22.5 MVAr and 25 Feeder (SE Laguna Verde SF6 400 kV, SE Garden Bco. 1 SF6 115 kV, SE Jamapa Bcos. 1 and 2 230 kV, SE Paso del Toro 115 kV, San Cristobal East MVAr 115 kV SE, and SE Ocosingo MVAr 115 kV). The holder of the Contract with CFE was constituted by the Companies. ELECNOR, IBERDROLA, ELÉCTRICAS and EDEMTEC, in which Electricidad de Medellín / Edemtec has a 27.02% stake in the Project.

Start Date: 05-jun-09
Final Date: 31-oct-12

COMMUNICATIONS. CONTRACT NO. 800156103

Supply, Installation and Commissioning of OPGW Cable, SDH Node and VOZ / IP Switch. As well as the Cable and Equipment Training Course: 25 Km. Link Tamos Altamira (Links 3); 55 Km S.E. Pantepec – S.E. Tamos Line A3F90 (Links 2); 94 Km S.E. Pantepec – S.E. Tamos Line 93160 (Links 2); 59 Km S.E. Poza Rica – S.E. Pantepec Line 93170 (Links 1).

Start Date: 24-apr-04
Final Date: 20-oct-04