Electrical substations

Close

Solicita Más Información

Llena los campos descritos en la parte inferior y nos pondrémos en contacto.




México – Tamaulipas

ELECTRICAL SUBSTATION. CONTRACT NO. PIF-014/2011

Construction and Installation of six (6) transmission lines with voltages of 400 and 138 KV and a total length of 85.65 kM-C and six (6) substations with voltages of 400 and 138 KV, with a capacity of 500 MVA of Transformation and fourteen (14) high voltage feeders, to be located in the State of Tamaulipas.

Start Date: 28-oct-11
Final Date: 04-may-13