ELECTRICAL SUBSTATION. CONTRACT NO. PIF-025/2004 PROJECT 103 SLT 704 BAJA CALIFORNIA - NORTHWEST

Engineering, Training, Procurement, Supply, Construction Civil and Electromechanical Works, Assembly, Testing and Commissioning of 2 Works of Transmission Lines with 115 kV voltages with a total length of 7.49 Km-C (LT Cereso entq Hermosillo I – And 2 Works of Transformation Substations with 115 / 13.8 kV voltages with a capacity of 80 MVA, 4.8 MVAr and 14 High Voltage Feeders (SE Cereso Bco. 1, SE Culicán Ote, Bco 1), in the States of Sinaloa and Sonora. The holder of the Contract with CFE was constituted by the Companies. ELECTRICAL / EDEMTEC and GPO. 3R (Eléctricas de Medellín / Edemtec has a 69.56% stake in the Project).

Start Date: 27-oct-04
Final Date: 29-aug-05