Electrical substations

Close

Solicita Más Información

Llena los campos descritos en la parte inferior y nos pondrémos en contacto.




México – Querétaro

ELECTRICAL SUBSTATION. CONTRACT NO. PIF-028/2004 PROJECT 42 LT ASSOCIATED NETWORK OF THE TAMAZUNCHALE CENTRAL

Engineering, Procurement of Materials and Equipment for Permanent Installation, Training, Construction and Commissioning of 3 Works of Transmission Lines with voltages of 400 kV and a total length of 397.1 Km-C (LT Las Mesas-Querétaro Pot. Querétaro Pot. Maneuvering Querétaro Pot – Tula PV (L1); LT Querétaro Pot. Maneuvering Querétaro Pot. -Tula PV (L2) and 3 Works of substations with 400/230 kV ballast with a capacity of 375 MVA , 233.3 MVAr of the inductive type and 12 Feeders (SE Tables + MVAr; SE Querétaro Pot. Maneuvers; SE Queretaro Pot Pot. 4 3AT-1F-125 MVA-400/230 kV), in the States of Hidalgo, Querétaro and San Luis Potosí The holder of the Contract with CFE was formed by the Companies ABB and ELÉCTRICAS / EDEMTEC (Electricity of Medellín / Edemtec has a 66.67% stake in the Project).

Start Date: 09-nov-04
Final Date: 30-oct-06

ELECTRICAL SUBSTATION. AGREEMENT NO. RRCE-051004 S.E. QUERÉTARO I

Construction of the Civil and Electromechanical Works which includes partial supply of the S.E. Querétaro I Bank 2 Replacement 4AT – 1F – 75.0 MVA – 230/115 KV – 0/0 A, Bank from the S.E. Yautepec Power, located in the State of Querétaro.

Start Date: 02-jan-06
Final Date: 16-oct-06