ELECTRICAL SUBSTATION. CONTRACT No. EPR / CCL-01-L / 2 SIEPAC PROJECT - LOT 2 - PANAMA

Design of Final Engineering, Supply of Materials and Equipment, Civil Works, Electromechanical Works, Final Testing and Commissioning of the SIEPAC Transmission Line Lote 2 in Panama (150 km of 230 kV double circuit) APCA (CONSORCIO) ABENGOA – INABENSA IS THE MAIN CONTRACTOR.

Start Date: 14-feb-07
Final Date: 31-aug-10