ELECTRICAL SUBSTATION. CONTRACT NO. RRNE-061006 S.E. JERÓNIMO ORTIZ MARTÍNEZ BCO. 3 + MVAR

Engineering, Partial Supply and Construction of the Civil and Electromechanical Works of the S.E. Jerónimo Ortiz Martínez Bco. 3 + MVAR, consisting of 2 feeders of 400 kV, a transformation bank of 3 AT’s 400/230 / 13.8 kV of 100 MVA and 2 bcos. Of 400 kV power reactors. Contract holder EDEMTEC / GPO. 3R TERMOTECNICA (Edemtec has a 65% participation of the Project).

Start Date: 02-jan-07
Final Date: 31-mar-08

ELECTRICAL SUBSTATION. CONTRACT NO. EAR-EDM-001-02 PROJECT 58 SE 607 BAJIO - ORIENTAL SYSTEM

(Contract CFE PIF-015/2002 Titular Earth – GPO 3R). Engineering, Training, Supply and Construction of Transmission Lines Santa Fe entq. San Luis de la Paz II-Queretaro I at 230 kV and 2.6 km; Santa Fe entq. La Fragua-Jurita at 115 kV and 23.44 Km; Santa Fe-San Miguel de Allende to 115 kV and 20.46 km. And the Electrical Substations of Aguascalientes Power with voltage of 400/230 / 13.8 kV and Encarnación de Diaz with voltage of 115 kV.

Start Date: 13-nov-02
Final Date: 20-feb-04

ELECTRICAL SUBSTATION. CONTRACT NO. EAR-EDM-002-02 PROJECT 58 SE 607 BAJIO - ORIENTAL SYSTEM

(Contract CFE PIF-015/2002 Titular Earth – GPO 3R). Engineering, Training, Supply and Construction of Transmission Lines Aguascalientes Power entq. San Juan de los Lagos-Teocaltiche to 230 kV and 53.9 km, and the Santa Fe, San Miguel de Allende and Puebla II substations to 230 kV.

Start Date: 09-nov-02
Final Date: 12-mar-04