Electrical substations

Close

Solicita Más Información

Llena los campos descritos en la parte inferior y nos pondrémos en contacto.




México – Chihuahua

TRANSMISSION LINE. CONTRACT NO. RRNE-131004

Construction and Installation from 3 (three) Transmission Lines with voltages of 230 and 115 kV and a total length of 29.2 km-c and 2 (two) Substations with voltages of 230 and 115 kV, with 133.3 MVA, 18 MVAr and 5 (five) Feeders, located in the State of Chihuahua, United Mexican States.

Start Date: 03-feb-12 
Final Date: 17-jan-13

ELECTRICAL SUBSTATION. CONTRACT NO. PIF-018/2011

Construction and Installation of 2 (two) Works: 1 (one) Work is a Distribution Substation with 115 kV and 13.8 kV voltages, with a total capacity of 30 MVA, 1.8 MVAr in Medium Voltage, 2 High Voltage Feeders and 4 Medium Voltage Feeders; And 1 (one) High Voltage Line Work at 115 kV with 2,476 Km-C, to be located in the State of Chihuahua, United Mexican States.

Start Date: 09-jan-12 
Final Date: 31-jan-13

ELECTRICAL SUBSTATION. CONTRACT NO. PIF-026/2006

Project Development, Engineering, Procurement, Supply, Construction, Training and Commissioning of 1 Transmission Line with voltage of 400 kV and a length of 164.8 Km-C (LT Moctezuma – New Casas Grandes II), and 3 Substations with voltages Of 230 kV with a capacity of 23.4 MVAr and 2 Feeders (SE Nacozari MVAr L1 and L2, SE Moctezuma and SE Nuevo Casas Grandes II Ampl. + MVAr). The holder of the Contract with CFE was constituted by the Companies. ELECTRICAL / EDEMTEC and GPO. 3R TERMOTECNICA (Eléctricas de Medellín / Edemtec has a 67.90% stake in the Project).

Start Date: 08-dec-06
Final Date: 31-mar-08