ELECTRICAL SUBSTATION. CONTRACT NO. PIF-022/2012

Construction and installation of 7 (seven) Transmission Lines with 230 and 85 kV voltage and a total length of 16.1 Km-C and 10 (ten) Substations with voltage of 230, 85 and 23 kV, with a capacity of 780 MVA and 124.2 MVAr of compensation and 123 (one hundred and twenty three) Feeders in High Voltage, that will be located in the Federal District and the State of Mexico.

Start Date: 09-nov-12
Final Date: 30-apr-15