México – Campeche

TRANSMISSION LINE. CONTRACT NO. PIF-023/2015

Construction and installation of 3 (three) Substations with a total capacity of 48 MVAr of compensation, with 4 (four) feeders in 230 and 115 kV; 2 (two) Transmission Lines with 230 kV voltage with a total length of 367.4 km-C that will be located in the States of Campeche and Quintana Roo, United Mexican States.

Start Date: 02-jul-15
Final Date: 21-jan-17

ELECTRICAL SUBSTATION. CONTRACT NO. PIF-018/2014

Construction and Installation of 1 (one) Substation with voltages of 115 and 13.8 kV with a total capacity of 40 MVA, 2 (two) Feeders and 2 (two) Transmission Lines with 115 kV voltage and a total length of 68.80 Km- C, which will be located in the state of Campeche.

Start Date: 02-oct-14
Final Date: 09-jan-16