Electrical substations

Close

Solicita Más Información

Llena los campos descritos en la parte inferior y nos pondrémos en contacto.




México – Aguascalientes

ELECTRICAL SUBSTATION. CONTRACT NO. PIF-007/2003

Engineering, Training, Procurement, Supply, Construction Civil and Electromechanical Works, Assembly, Testing and Commissioning of 2 Works of Transmission Lines with voltages of 400 kV and a length of 443.9 Km-C (TL Saltillo CC – May Day 400 KV, 2C, 223.3 Km-C ACSR / AS 1113 and LT First of May – Cañada 400 kV, 2C, 220.6 Km-C ACSR / AS 1113), and 3 Works of Substations with voltages of 400 kV with a capacity of 300 MVAr And 4 Feeders (SE Saltillo CC + MVAr, SE First of May + MVAr and SE Cañada), located in the States of Aguascalientes, Coahuila, San Luis Potosí and Zacatecas.

Location: Aguascalientes, Mexico
Start Date: 08-jul-03 
Final Date: 14-may-04

ELECTRICAL SUBSTATION. CONTRACT NO. PIF-006/2001

Design, procurement of materials and construction of 24 substations with voltages of 115, 69, 34.5, 23 and 13.8 KV. The Principal Contractor to CFE is the CONSUMER CONTROL AND INDUSTRIAL ASSEMBLY CYMI, S.A. (42%) AND SIEMENS, S.A. DE C.V. (58%) (EDEMTEC has an Association Agreement with CYMI, with a 30% stake, for the execution of works carried out by CYMI, consisting of 11 Substations).

Start Date: 29-may-01
Final Date: 01-nov-02