POWER LINES. CONTRACT NO. PIF-008/2011 "248 SLT 1401 SE'S AND LT'S OF THE BAJA CALIFORNIA AND NORTHWEST AREAS (2A PHASE)"

Construction and Installation of three (3) transmission lines with voltages of 230, 115 KV and a total length of 99.2 kM-C and two (2) substations with voltages of 230, 115 KV, with a capacity of 300 MVA and 22.5 MVAr of compensation and nine (9) high voltage feeders, which will be located in the State of Sonora.

Start Date: aug-09
Final Date: 16-oct-12

POWER LINES. CONTRACT NO. SIEMENS - 01/2006 S.E. NOGALES AIRPORT, S.E. NOGALES NORTE Y L.T. NOGALES AIRPORT-NOGALES NORTH

(Contract CFE PIF-003/2006 Owner Siemens). Engineering, Partial Supply and Construction of the Civil and Electromechanical Works of the S.E. Nogales Aeropuerto 1A 115 kV, S.E. Nogales Norte 1A 115 kV and L.T. Nogales Airport – Nogales Norte 230 kV – 2C – 24.1 Km-C – 1113 ACSR – TA / PA (Grupo 3R Termotecnica, owner of the Subcontract has an Association Agreement with Edemtec for the execution of the Works described).

Start Date: 02-mar-06 
Final Date: 24-jun-07

POWER LINES. CONTRACT NO. PIF-010/2001 PROJECT 29 LT 408 NACO - NOGALES

Design, Procurement, Supplies, Construction and Installation and Commissioning of L.T. To 400 kV El Fresnal – Nacozari with a length of 99 Km-C and 2 Substations with voltages of 230 kV and 4 Feeders (SE Nacozari and SE El Fresnal), in the state of Sonora. The Company DINEC I, S.A de C.V. Holder of a Contract with CFE, was constituted by Dragos Industrial, S.A., Control and Industrial Assemblies CYMI, S.A. And Eléctricas de Medellín Ltda. In which ELÉCTRICAS DE MEDELLÍ / EDEMTEC has a 44% interest.

Start Date: 27-sep-01
Final Date: 07-oct-02

POWER LINES. CONTRACT NO. PIF-025/2004 PROJECT 103 SLT 704 BAJA CALIFORNIA - NORTHWEST

Engineering, Training, Procurement, Supply, Construction Civil and Electromechanical Works, Assembly, Testing and Commissioning of 2 Works of Transmission Lines with 115 kV voltages with a total length of 7.49 Km-C (LT Cereso entq Hermosillo I – And 2 Works of Transformation Substations with 115 / 13.8 kV voltages with a capacity of 80 MVA, 4.8 MVAr and 14 High Voltage Feeders (SE Cereso Bco. 1, SE Culicán Ote, Bco 1), in the States of Sinaloa and Sonora. The holder of the Contract with CFE was constituted by the Companies. ELECTRICAL / EDEMTEC and GPO. 3R (Eléctricas de Medellín / Edemtec has a 69.56% stake in the Project).

Start Date: 27-oct-04
Final Date: 29-aug-05