México – Nuevo León

POWER LINES. CONTRACT NO. EAR-EDM-001-02 PROJECT 58 "SE 607 BAJIO SYSTEM - ORIENTAL"

(Contract CFE PIF-015/2002 Titular Earth – GPO 3R). Engineering, Training, Supply and Construction of Transmission Lines Santa Fe entq. San Luis de la Paz II-Queretaro I at 230 kV and 2.6 km; Santa Fe entq. La Fragua-Jurita at 115 kV and 23.44 Km; Santa Fe-San Miguel de Allende to 115 kV and 20.46 km. And the Electrical Substations of Aguascalientes Power with voltage of 400/230 / 13.8 kV and Encarnación de Diaz with voltage of 115 kV.

Start Date: 13-nov-02
Final Date: 20-feb-04

POWER LINES. CONTRACT NO. EAR-EDM-002-02 PROJECT 58 SE 607 BAJIO SYSTEM - ORIENTAL

(Contract CFE PIF-015/2002 Titular Earth – GPO 3R). Engineering, Training, Supply and Construction of Transmission Lines Aguascalientes Power entq. San Juan de los Lagos-Teocaltiche to 230 kV and 53.9 km, and the Santa Fe, San Miguel de Allende and Puebla II substations to 230 kV.

Start Date: 09-nov-02
Final Date: 12-mar-04