Guatemala

“SOUTH PACIFIC RING” PROJECT. CONTRACT C040

For Transmission Lines To 230 Kv That make The South Pacific Ring In Guatemala. Engineering (Partial) And Construction Of 99 Km Of Transmission Lines 230 Kv, Double Circuit.

Start Date: 01-apr-15
Final Date: 30-sep-16

“PET-1-2009” PROJECT

For The Ministry Of Mines And Energy (Mem) In Guatemala, For The Reinforcement Of The 230 Kv Transmission System Of Guatemala Consisting In The Engineering Works, Supply And Construction Of 850 Km Of Transmission Lines 230 Kv, Double Circuit, And 24 Electrical Substations 230 kV, 1580 MVA.

Start Date: 10-feb-14
Final Date: 15-oct-15