LT CUAJIMALPA. CONTRACT RRCE-CO-07-16

Construction Of Civil And Electromechanical Construction Of The Crossing With The L.T. Cuajimalpa – Aguilas Of 230 Kv – 2c – 0.50 Km -1113 Acsr / As – 1c / F – Ta / Pa, Includes Supply And Dismantling, Work Located In The Cuajimalpa Delegation, Mexico City

Start Date: January 2017
Final Date: June 2017

LT CONTADERO. CONTRACT RRCE-161005

Construction Of Civil And Electromechanical Construction Of The Crossings With The L.T. Contadero – Aguilas Of 230 Kv – 2c – 0.72km – 1113 Acsr / As – 1 C / F – Ta Y L.T. Tacubaya – Replacement of 85 Kv – 2c – 0.61 Km – 795 Acsr / As – 1 C / F – Ta / Pa, Includes Supply and Dismantling, Works Located in Mexico City. 

Start Date: January 2017
Final Date: August 2017

LT’S TAXQUEÑA - 93160–TOPILEJO Y EL OLIVAR - 93E30 – ODÓN DE BUEN CONTRACT RRCE-02

For Enhancement Of A 230kv Line Section, 2circuits, 1 Conductor Per Phase, 1113 Acsr / As Cable, Self-Supporting Steel Towers / Trunk Posts, 0.350 Km – Line, In The Delegation Álvaro Obregón, Distrito Federal. Includes Engineering Activities, Supply, Construction and Testing.

Start Date: 29-jun-15
Final Date: 26-sep-15

PROJECT "274 SE 1620 DISTRIBUTION VALLE DE MÉXICO" (1st PHASE) CONTRACT PIF-022/2012

Engineering, Search For Materials And Equipment Of Permanent Installation, Training, Construction And Commissioning Of 7 Transmission Lines With Voltage Of 230 And 85 Kv And A Total Length Of 16.8 Km-C And 10 Substations With Voltage Of 230, 85 And 23 Kv, With A Capacity Of 780 Mva And 46.8 Mvar Of Compensation And 123 Feeders In High Voltage, Which Will Find In The Federal District And The State Of Mexico, Of The Mexican United States. Includes Las Siguienets Works:
►LT Coyoacan – Narvarte. 230 Kv, 1 Cto, Underground Cable, 2.90 Km-Line, 2.90 Km-Circuit, Caliber 1200 Mm2, One Conductor Per Phase
►LT Verónica Entq Cuauhtémoc – Morales. 230 Kv, 2 Ctos, Underground Cable, 1.60 Km-Line, 1.60 Km-Circuit, Caliber 1200 Mm2, One Conductor Per Phase.
►The Kings Entq La Paz – Aurora. 230 Kv, 2c, Trunks, 1.40 Km-Line, 2.80 Km-Circuit, Acsr / As 1113, One Conductor Per Phase.
►LT Culhuacan – Xochimilco. 230 Kv, 2 Ctos, Underground Cable, 4.30 Km-Line, 8, .60 Km-Circuit, Caliber 1200 Mm2, One Conductor Per Phase. “
►LT El Rosal Entq Odon De Buen – Topilejo. 230 Kv, 2 Ctos, Trunk Posts, 0.30 Km-Line, 0.60 Km-Circuit, Acsr / As 1113, One Conductor Per Phase.
►LT Chimalpa Entq Remedios – Bosques. 230 Kv, 2 Ctos, Trunk Posts, 0.10 Km-Line, 0.20 Km-Circuit, Acsr / As 1113, One Conductor Per Phase.
►LT Tlatelulco Entq San Francisco – Zicatepec. 85 Kv, 2 Ctos, Troncocónicos Poles / Self-supporting Towers, 0.05 Km-Line, 0.10 Km-Circuit, Acsr / As 795, One Conductor Per Phase.
►SE Narvarte Bcos. 1 and 2 Sf6 (Replacement), Of the Type Gis. 2t-3f-60 Mw 230/23 Kv 2/16; 1a 230 Kv L.T. Coyoacán; 1a 230 Kv L.T. Countess; Bank Of Capacitors 2×3.6 Mvar.
►SE Coyoacán, Del Type Gis. 1a 230 Kv L.T. Narvarte. “
►SE Verónica Bcos. 1 and 2 Sf6 (Replacement), Of the Type Gis. 2t-3f-60 Mw 230/23 Kv 2/16; 1a 230 Kv L.T. Cuauhtémoc; 1a 230 Kv L.T. Anahuac; Bank Of Capacitors 2×3.6 Mvar.
►SE Zumpango Bcos. 1 and 2 (Replacement). 2t-3f-30 Mw 85/23 Kv 2/8; 2a 85 Kv L.T. Apasco C-1 and C-2; Bank Of Capacitors 2×1.8 Mvar.
►SE Los Reyes Bcos. 1 and 2 Sf6 (Substitution). Type Gis. 2t-3f-60 Mw 230/23 Kv 2/16; 1a 230 Kv L.T. Peace; 1a 230 Kv L.T. Dawn; Bank Of Capacitors 2×3.6 Mvar.
►SE Culhuacán Bcos. 1 and 2 Sf6, Of the Type Gis. 2t-3f-60 Mw 230/23 Kv 2/16; 2a 230 Kv L.T. Xochimilco C-1 and C-2; Bank Of Capacitors 2×3.6 Mvar.
►SE Xoxhimilco, Del Type Gis. 2a 230 Kv L.T. Culhuacán C-1 and C-2. “
►SE El Rosal Bcos. 1 and 2 Sf6, Of the Type Gis. 2t-3f-60 MVA 230/23 Kv 2/16: 1a 230 Kv L.T. Contreras; 1a 230 Kv L.T. Topilejo; Bank Of Capacitors 2×3.6 Mvar.
►SE Chimalpa Bco. 1 Sf6, Del Gis Type. 1t-3f-60 Mw 230/23 Kv 2/8; 1a 230 Kv L.T. Remedies; 1a 230 Kv L.T. Forests; Bank Of Capacitors 3.6 Mvar.

Start Date: 09-nov-12
Final Date: 01-apr-15