Power Lines

Close

Solicita Más Información

Llena los campos descritos en la parte inferior y nos pondrémos en contacto.




México – Campeche

PROJECT "320 LT 1905 SOUTH-PENINSULAR TRANSMISSION" (2nd PHASE). CONTRACT PIF-023/2015

Construction And Installation Of 3 (Three) Substations With A Total Capacity Of 48 Mvar Compensation, With 4 (Four) Feeders In 230 And 115 Kv; 2 (Two) Power Lines With Voltage Of 230 Kv With A Total Length Of 367.4 Km-C That Will Be Located In The States Of Campeche And Quintana Roo, Of The Mexican United States. Includes Engineering Activities, Supply, Construction and Testing.

Start Date: 02-jul-15
Final Date: 21-jan-17

PROJECT: " 308 SLT 1804 SUBSTATIONS AND LINES EASTERN POWER - PENINSULAR "(3rd PHASE) (2nd ANNOUNCEMENT). CONTRACT PIF-018/2014

Execution Of All Works Required For Construction And Installation Of 1 (One) Substation With Voltages Of 115 And 13.8 Kv With A Total Capacity Of 40 Mva, 2 (Two) Feeder And 2 (Two) Power Lines With Voltage Of 115 Kv And A Total Length Of 67.12 Km-C That Will Be Located In The State Of Campeche, Of The Mexican United States.
► LT Puerto Real – Carmen (Provisional Line). 115 Kv, 2c, Pm, 13.40 Km-Line, 26.80 Km-Circuit, Acsr / As 477, One Conductor Per Phase.
► LT Puerto Real – Carmen. 115 Kv, 2c, Ta / Cs, 19.36 Km-Line, 40.32 Km-Circuit, Acsr / As 1113, One Conductor Per Phase.
► If Carmen. 2a 115 Kv L.T. Sabancuy Ii (C1 + C2)Includes Engineering Activities, Supply, Construction and Testing. 

Start Date: 02-oct-14
Final Date: 15-abr-16