{"id":1360,"date":"2021-04-13T21:13:41","date_gmt":"2021-04-13T21:13:41","guid":{"rendered":"https:\/\/www.edemtec.mx\/project\/proyecto-214-se-1210-norte-noreste-6a-fase-contrato-pif-048-2015\/"},"modified":"2021-05-13T02:23:51","modified_gmt":"2021-05-13T02:23:51","slug":"project-214-se-1210-norte-noreste-6a-fase-contract-pif-048-2015","status":"publish","type":"project","link":"https:\/\/www.edemtec.mx\/en\/project\/project-214-se-1210-norte-noreste-6a-fase-contract-pif-048-2015\/","title":{"rendered":"PROJECT 214 SE 1210 NORTE-NORESTE 6A. FASE. CONTRACT PIF-048\/2015"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Execution of all the works necessary for the construction and installation of 1 (one) work: 1 (one) transmission line with voltage of 115 kV with a total length of 24.5 km-c, located in the state of Sonora. Includes activities of engineering, supply, construction and tests..<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Execution of all the works necessary for the construction and installation of 1 (one) work: 1 (one) transmission line with voltage of 115 kV with a total length of 24.5 km-c, located in the state of Sonora. Includes activities of engineering, supply, construction and tests..<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","template":"","meta":{"_et_pb_use_builder":"off","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"project_category":[],"project_tag":[],"tipo":[8],"pais":[11],"estado":[28],"class_list":["post-1360","project","type-project","status-publish","hentry","tipo-lineas","pais-mexico","estado-sonora"],"_links":{"self":[{"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project\/1360","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/types\/project"}],"author":[{"embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/comments?post=1360"}],"version-history":[{"count":1,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project\/1360\/revisions"}],"predecessor-version":[{"id":1390,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project\/1360\/revisions\/1390"}],"wp:attachment":[{"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/media?parent=1360"}],"wp:term":[{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project_category?post=1360"},{"taxonomy":"project_tag","embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project_tag?post=1360"},{"taxonomy":"tipo","embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/tipo?post=1360"},{"taxonomy":"pais","embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/pais?post=1360"},{"taxonomy":"estado","embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/estado?post=1360"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}