{"id":1290,"date":"2021-04-15T21:52:45","date_gmt":"2021-04-15T21:52:45","guid":{"rendered":"https:\/\/www.edemtec.mx\/project\/proyecto-248-slt-1401-ses-y-lts-de-las-areas-baja-california-y-noroeste-2a-fase-contrato-no-pif-008-2011\/"},"modified":"2021-05-13T00:03:34","modified_gmt":"2021-05-13T00:03:34","slug":"project-248-slt-1401-ses-y-lts-de-las-areas-baja-california-y-noroeste-2a-fase-contract-no-pif-008-2011","status":"publish","type":"project","link":"https:\/\/www.edemtec.mx\/en\/project\/project-248-slt-1401-ses-y-lts-de-las-areas-baja-california-y-noroeste-2a-fase-contract-no-pif-008-2011\/","title":{"rendered":"PROJECT 248 SLT 1401 SE\u2019S Y LT\u2019S DE LAS AREAS BAJA CALIFORNIA Y NOROESTE (2A. FASE). CONTRACT No. PIF-008\/2011"},"content":{"rendered":"\n<p>Engineering, procurement of materials and permanent installation equipments, training, construction and commissioning of 3 LT\u2019s with voltages of 230, 115 kV and a length of 99.2 km-c and 2 SE\u2019s with voltages of 230, 115 kV with a capacity of 300 MVA and 22.5 MVAr of compensation and 9 feeders in high voltage, in the state of Sonora.<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>LT El Mayo \u2013 Huatabampo. 115 kV, 2 circuits, 27 km-l, 54 km-c, shares structures of 4c in 4 km with LT El Mayo Entq. \u2013 Navojoa Ind.<\/li><li>LT El Mayo Entronque Navojoa \u2013 Navojoa Industrial. 115 kV, 2 circuits, 17.4 km-l, 44.2 km-c.<\/li><li>LT El Mayo Entq. Pueblo Nuevo \u2013 Los Mochis II. 230 kV, 1 km-l, 1 km-c.<\/li><li>SE Huatabampo. 2 at 115 kV (LT El Mayo); 1 at 115 kV Tap. LT Huatabampo-Valle del Mayo- Navojoa.<\/li><li>SE El Mayo Bco. 1 + MVAr 4-At-1f-300 MVA 230\/115\/13.8 Kv 2\/4; 2 AT 230 kV entq. LT Pueblo Nuevo-Los Mochis II; 2 at 115 kV LT Huatabampo: 2 at 115 kV entq. LT Navojoa-Navojoa Ind. And capacitor bank 22.5 MVAr.<\/li><\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Engineering, procurement of materials and permanent installation equipments, training, construction and commissioning of 3 LT\u2019s with voltages of 230, 115 kV and a length of 99.2 km-c and 2 SE\u2019s with voltages of 230, 115 kV with a capacity of 300 MVA and 22.5 MVAr of compensation and 9 feeders in high voltage, in the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","template":"","meta":{"_et_pb_use_builder":"off","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"project_category":[],"project_tag":[],"tipo":[8,9],"pais":[11],"estado":[28],"class_list":["post-1290","project","type-project","status-publish","hentry","tipo-lineas","tipo-subestaciones","pais-mexico","estado-sonora"],"_links":{"self":[{"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project\/1290","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/types\/project"}],"author":[{"embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/comments?post=1290"}],"version-history":[{"count":1,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project\/1290\/revisions"}],"predecessor-version":[{"id":1296,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project\/1290\/revisions\/1296"}],"wp:attachment":[{"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/media?parent=1290"}],"wp:term":[{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project_category?post=1290"},{"taxonomy":"project_tag","embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project_tag?post=1290"},{"taxonomy":"tipo","embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/tipo?post=1290"},{"taxonomy":"pais","embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/pais?post=1290"},{"taxonomy":"estado","embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/estado?post=1290"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}