{"id":1289,"date":"2021-04-15T21:45:39","date_gmt":"2021-04-15T21:45:39","guid":{"rendered":"https:\/\/www.edemtec.mx\/project\/proyecto-244-se-1321-distribucion-noreste-3a-fase-contrato-no-pif-018-2011\/"},"modified":"2021-05-13T00:09:00","modified_gmt":"2021-05-13T00:09:00","slug":"project-contract-no-pif-018-2011","status":"publish","type":"project","link":"https:\/\/www.edemtec.mx\/en\/project\/project-contract-no-pif-018-2011\/","title":{"rendered":"PROJECT <<244 SE 1321 DISTRIBUCION NORESTE (3A. FASE)>> CONTRACT No. PIF-018\/2011"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Engineering, procurement of materials and permanent installed equipment, training, construction and commissioning of 2 works: one distribution substation with voltages of 115 kV and 13.8 kV, with a total capacity of 30 MVA; 1.8 MVAr in medium voltage; 2 feeders in high voltage and 4 feeders in medium voltage; 1 work of high voltage line in 115 kV with 2.476 km-c, located in the state of Chihuahua.<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>LT Abraham Gonzalez Entq. Boquilla \u2013 Camargo Uno. 115 kV, 2 circuits, 1.24 km-l, conductor cable: 477 ACSR; self-supported poles.<\/li><li>SE Abraham Gonzalez Bc.01 + MVAr. 1t-3f-30MVA-115\/13.8 kV-2\/4a+ 1,8MVAr.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Fecha de Inicio: 15-dic-11<\/strong><br><strong>Fecha de Terminaci\u00f3n: 17-ene-13<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Engineering, procurement of materials and permanent installed equipment, training, construction and commissioning of 2 works: one distribution substation with voltages of 115 kV and 13.8 kV, with a total capacity of 30 MVA; 1.8 MVAr in medium voltage; 2 feeders in high voltage and 4 feeders in medium voltage; 1 work of high voltage line [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","template":"","meta":{"_et_pb_use_builder":"off","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"project_category":[],"project_tag":[],"tipo":[8,9],"pais":[11],"estado":[27],"class_list":["post-1289","project","type-project","status-publish","hentry","tipo-lineas","tipo-subestaciones","pais-mexico","estado-chihuahua"],"_links":{"self":[{"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project\/1289","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/types\/project"}],"author":[{"embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/comments?post=1289"}],"version-history":[{"count":1,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project\/1289\/revisions"}],"predecessor-version":[{"id":1298,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project\/1289\/revisions\/1298"}],"wp:attachment":[{"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/media?parent=1289"}],"wp:term":[{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project_category?post=1289"},{"taxonomy":"project_tag","embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project_tag?post=1289"},{"taxonomy":"tipo","embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/tipo?post=1289"},{"taxonomy":"pais","embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/pais?post=1289"},{"taxonomy":"estado","embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/estado?post=1289"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}