{"id":1271,"date":"2021-04-15T21:56:06","date_gmt":"2021-04-15T21:56:06","guid":{"rendered":"https:\/\/www.edemtec.mx\/project\/proyecto-211-slt-1203-transmision-y-transformacion-oriental-sureste-1a-fase-contrato-no-pif-017-2009\/"},"modified":"2021-05-12T23:57:39","modified_gmt":"2021-05-12T23:57:39","slug":"project-211-slt-1203-transmision-y-transformacion-oriental-sureste-1a-fase-contract-no-pif-017-2009","status":"publish","type":"project","link":"https:\/\/www.edemtec.mx\/en\/project\/project-211-slt-1203-transmision-y-transformacion-oriental-sureste-1a-fase-contract-no-pif-017-2009\/","title":{"rendered":"PROJECT 211 SLT 1203 TRANSMISION Y TRANSFORMACION ORIENTAL-SURESTE (1A FASE). CONTRACT No. PIF-017\/2009"},"content":{"rendered":"\n<p>Engineering, supply, construction, training and commissioning of 9 LT\u2019s of 400, 230 and 115 kV and a total length of 196.1 km-c and 6 SE\u2019s with voltages of 400, 230 and 115 kV, with a capacity of 1175 MVA nad 22.5 MVAr and 25 feeders, in the states of Chiapas and Veracruz.<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>LT Jardin \u2013 Veracruz II. 115 kV, 2 circuits, self-supported towers, 1.1 km-l, 2.2 km-c, one conductor ACSR\/As 795 per phase.<\/li><li>LT Jardin \u2013 Infonavit 115 kV, 2 circuits, subterranean cables, 0.2 km-l, 1.3 km-c; conductor cable of the XLPE type copper and a transversal section of 1.000 squared millimeters per phase.<\/li><li>LT Laguna Verde \u2013 Jamapa. 400 kV, 2 circuits, self-supported towers, 84.7 km-l, 168.4 km-c, two conductors ACSR\/As 1113 per phase.<\/li><li>LT Jamapa Entq. Veracruz II \u2013 Temascal II L1. 230 kV, 2 circuits, self-supported towers, 2.5 km-l, 5 km-c, ACSR\/As 1113, one conductor per phase.<\/li><li>LT Jamapa Entq. Jardin \u2013 Temascal II L2. 230 kV, 2 circuits, self-supported towers, 2.5 km-l, 500 km-c, ACSR\/As 1113, one conductor per phase.<\/li><li>LT Jardin \u2013 Las Brisas. 115 kV, 2 circuits, self-supported towers\/subterranean cable, 3.1 km-l, 4.8 km-c. Conductor cable XLPE type, copper and a transversal section of 1.000 squared millimeters per phase.<\/li><li>LT Jardin \u2013 J.B. Lobos. 115 kV, 2 circuits, self-supported towers\/subterranean cables, 3.1 km-l, 4.8 km-c. Conductor cable XLPE type, copper and transversal section of 1.000 squared millimeters per phase and ACSR\/As 795.<\/li><li>LT Paso del Toro Entq. Boca del Rio \u2013 La Granja III. 115 kV, 4 circuits, self-supported towers, 0.3 km-l, 1.2 km-c, conductor cable ACSR\/As 795.<\/li><li>LT Jamapa Entq. Veracruz II \u2013 Amatlan II. 230 kV, 4 circuits, self-supported towers, 1.4 km-l, 5.6 km-c; conductor cable ACSR\/As 1113, one conductor per phase.<\/li><li>SE Jamapa Bcos. 1 y 2 7at-1f-125 MVA, 400\/230 kV 2\/8; 2 at 400 kV LT Laguna Verde (C1 + C2); 1 at 230 kV LT Jardin; 1 at 230 kV LT Veracruz II; 2 at 230 kV LT Temascal II; 2 at 230 kV LT Amatlan II; 2 at 230 kV LT Tamsa II.<\/li><li>SE Paso del Toro 1 at 115 kV LT Granja III; 1 at 115 kV LT Boca del Rio.<\/li><li>SE Laguna Verde (Sf6) Maniobras 2 at 400 kV LT Jamapa (C1+C2); 2 at 400 kV LT Laguna Verde (U1+U2); 1 at 400 kV LT Puebla II; 1 at 400 kV LT Cruz Azul Maniobras; 1 at 400 kV LT Poza Rica II.<\/li><li>SE Jardin Bco. 1 (Sf6) 4at-1f-75MVA, 230\/115 kV 0\/6; 2 at 115 kV LT Veracruz II; 2 at 115 kV LT Las Brisas; 1 at 115 kV LT J.B. Lobos; 1 at 115 kV LT Infonavit.<\/li><li>SE San Cristobal Oriente MVAr Capacitor Bank of 15 MVAr in the voltage level of 115 kV.<\/li><li>SE Ocosingo MVAr Capacitor Bank of 7.5 MVAr in the voltage level of 115 kV.<\/li><\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Engineering, supply, construction, training and commissioning of 9 LT\u2019s of 400, 230 and 115 kV and a total length of 196.1 km-c and 6 SE\u2019s with voltages of 400, 230 and 115 kV, with a capacity of 1175 MVA nad 22.5 MVAr and 25 feeders, in the states of Chiapas and Veracruz. LT Jardin \u2013 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","template":"","meta":{"_et_pb_use_builder":"off","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"project_category":[],"project_tag":[],"tipo":[8,9],"pais":[11],"estado":[25,38],"class_list":["post-1271","project","type-project","status-publish","hentry","tipo-lineas","tipo-subestaciones","pais-mexico","estado-chiapas","estado-veracruz"],"_links":{"self":[{"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project\/1271","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/types\/project"}],"author":[{"embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/comments?post=1271"}],"version-history":[{"count":1,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project\/1271\/revisions"}],"predecessor-version":[{"id":1276,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project\/1271\/revisions\/1276"}],"wp:attachment":[{"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/media?parent=1271"}],"wp:term":[{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project_category?post=1271"},{"taxonomy":"project_tag","embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project_tag?post=1271"},{"taxonomy":"tipo","embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/tipo?post=1271"},{"taxonomy":"pais","embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/pais?post=1271"},{"taxonomy":"estado","embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/estado?post=1271"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}