{"id":1270,"date":"2021-04-15T21:58:01","date_gmt":"2021-04-15T21:58:01","guid":{"rendered":"https:\/\/www.edemtec.mx\/project\/proyecto-50-lt-610-transmision-noroeste-norte-2a-fase-contrato-no-pif-026-2006\/"},"modified":"2021-05-12T23:57:04","modified_gmt":"2021-05-12T23:57:04","slug":"project-50-lt-610-transmision-noroeste-norte-2a-fase-contract-no-pif-026-2006","status":"publish","type":"project","link":"https:\/\/www.edemtec.mx\/en\/project\/project-50-lt-610-transmision-noroeste-norte-2a-fase-contract-no-pif-026-2006\/","title":{"rendered":"PROJECT 50 LT 610 TRANSMISION NOROESTE \u2013 NORTE (2A FASE). CONTRACT No. PIF-026\/2006"},"content":{"rendered":"\n<ul class=\"wp-block-list\"><li>LT Moctezuma \u2013 Nuevo Casas Grandes II (0-51 km-l, 164.8 km-c. Section 1 from SE Moctezuma Al km 0+510. 230 kV, 1c, self-supported towers, 0-51 km-l, 0.51 km-c, ACSR\/As 1113 one conductor per phase; section 2 from km 0+510 to the SE Nuevo Casas Grandes II, 400 kV, initial operation 230 kV, 2c, existing self-supported towers, 0.00 km-l 164.29 km-c, ACSR\/As 1113 two conductors per phase. Laying of the second circuit.<\/li><li>SE Nacozari Mvar L1+L2 (neutral reactor for LT Nuevo Casas Grandes II (C1) and LT Nuevo Casas Grandes II (C2)).<\/li><li>SE Moctezuma (1 at 230 kV LT Nuevo Casas Grandes II (C2)).<\/li><li>SE Nuevo Casas Grandes II ampl. + Mvar (1 at 230 kV LT Moctezuma (C2) and one-phase reactors, 3 X 7 Mvar).<\/li><\/ul>\n","protected":false},"excerpt":{"rendered":"<p>LT Moctezuma \u2013 Nuevo Casas Grandes II (0-51 km-l, 164.8 km-c. Section 1 from SE Moctezuma Al km 0+510. 230 kV, 1c, self-supported towers, 0-51 km-l, 0.51 km-c, ACSR\/As 1113 one conductor per phase; section 2 from km 0+510 to the SE Nuevo Casas Grandes II, 400 kV, initial operation 230 kV, 2c, existing self-supported [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","template":"","meta":{"_et_pb_use_builder":"off","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"project_category":[],"project_tag":[],"tipo":[8,9],"pais":[11],"estado":[39,28],"class_list":["post-1270","project","type-project","status-publish","hentry","tipo-lineas","tipo-subestaciones","pais-mexico","estado-sinaloa","estado-sonora"],"_links":{"self":[{"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project\/1270","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/types\/project"}],"author":[{"embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/comments?post=1270"}],"version-history":[{"count":1,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project\/1270\/revisions"}],"predecessor-version":[{"id":1274,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project\/1270\/revisions\/1274"}],"wp:attachment":[{"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/media?parent=1270"}],"wp:term":[{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project_category?post=1270"},{"taxonomy":"project_tag","embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project_tag?post=1270"},{"taxonomy":"tipo","embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/tipo?post=1270"},{"taxonomy":"pais","embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/pais?post=1270"},{"taxonomy":"estado","embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/estado?post=1270"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}