{"id":1269,"date":"2021-04-15T21:57:04","date_gmt":"2021-04-15T21:57:04","guid":{"rendered":"https:\/\/www.edemtec.mx\/project\/proyecto-218-lt-red-de-transmision-asociada-a-el-proy-de-temporada-abierta-y-oaxaca-ii-iii-iv-1a-fase\/"},"modified":"2021-05-12T23:57:25","modified_gmt":"2021-05-12T23:57:25","slug":"project-218-lt-transmission-grid-associated-to-the-project-of-open-season-and-oaxaca-ii-iii-iv-1a-fase","status":"publish","type":"project","link":"https:\/\/www.edemtec.mx\/en\/project\/project-218-lt-transmission-grid-associated-to-the-project-of-open-season-and-oaxaca-ii-iii-iv-1a-fase\/","title":{"rendered":"PROJECT 218 LT TRANSMISSION GRID ASSOCIATED TO THE PROJECT OF OPEN SEASON AND OAXACA II, III, IV (1A. FASE)"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Engineering, procurement of materials and equipments of permanent installation, training, construction and commissioning of 2 transmission lines with voltage of 400 kV and a length of 424.2 km-c (LT Juile \u2013 Cerro de Oro 400 kV-154.28 km-c and LT La Ventosa \u2013 Juile 400 kV 270-6 km-c), and 3 substations with voltages of 400, 230 and 115 kV with a capacity of 2,125 MVA, 75 MVAr and 8 feeders (SE Cerro de Oro 400 kV, SE Juile + MVAr 400 kV and SE La Ventosa Bcos. 1, 2 and 3 400\/230\/115 kV). The titular of the Contract with CFE was constituted by ISOLUX, ELECTRICAS \/ EDEMTEC, PIDIRELYS (Electricas de Medellin\/Edemtec has a participation of 21.02% on the project).<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Engineering, procurement of materials and equipments of permanent installation, training, construction and commissioning of 2 transmission lines with voltage of 400 kV and a length of 424.2 km-c (LT Juile \u2013 Cerro de Oro 400 kV-154.28 km-c and LT La Ventosa \u2013 Juile 400 kV 270-6 km-c), and 3 substations with voltages of 400, 230 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","template":"","meta":{"_et_pb_use_builder":"off","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"project_category":[],"project_tag":[],"tipo":[8,9],"pais":[11],"estado":[12,38],"class_list":["post-1269","project","type-project","status-publish","hentry","tipo-lineas","tipo-subestaciones","pais-mexico","estado-oaxaca","estado-veracruz"],"_links":{"self":[{"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project\/1269","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/types\/project"}],"author":[{"embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/comments?post=1269"}],"version-history":[{"count":1,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project\/1269\/revisions"}],"predecessor-version":[{"id":1275,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project\/1269\/revisions\/1275"}],"wp:attachment":[{"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/media?parent=1269"}],"wp:term":[{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project_category?post=1269"},{"taxonomy":"project_tag","embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project_tag?post=1269"},{"taxonomy":"tipo","embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/tipo?post=1269"},{"taxonomy":"pais","embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/pais?post=1269"},{"taxonomy":"estado","embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/estado?post=1269"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}