{"id":1226,"date":"2021-04-15T22:13:06","date_gmt":"2021-04-15T22:13:06","guid":{"rendered":"https:\/\/www.edemtec.mx\/project\/proyecto-707-enlace-norte-sur-contrato-pif-007-2002\/"},"modified":"2021-05-12T23:34:06","modified_gmt":"2021-05-12T23:34:06","slug":"project-707-enlance-norte-sur-contract-pif-007-2002","status":"publish","type":"project","link":"https:\/\/www.edemtec.mx\/en\/project\/project-707-enlance-norte-sur-contract-pif-007-2002\/","title":{"rendered":"PROJECT 707 ENLANCE NORTE-SUR CONTRACT PIF-007\/2002"},"content":{"rendered":"\n<p>Engineering, procurement, construction, tests and commissioning of the following works in the states of Coahuila, Zacatecas and Aguascalientes:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Substation Saltillo (Enlargement) one bank of reactors of 150 MVAr and two bays of 400 kV.<\/li><li>Substation Primero de Mayo (Enlargement) one bank of reactors of 150 MVAr and two bays of 400 kV.<\/li><li>Substation Ca\u00f1ada (Enlargement) one bay of 400 kV.<\/li><li>LT Saltillo \u2013 Primero de Mayo (Installation of second circuit), 230 km, 400 kV-1c-2w\/ph.<\/li><li>LT Primero de Mayo \u2013 Ca\u00f1ada (Installation of second circuit), 220 km, 400 kV-1c-2w\/ph.<\/li><\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Engineering, procurement, construction, tests and commissioning of the following works in the states of Coahuila, Zacatecas and Aguascalientes: Substation Saltillo (Enlargement) one bank of reactors of 150 MVAr and two bays of 400 kV. Substation Primero de Mayo (Enlargement) one bank of reactors of 150 MVAr and two bays of 400 kV. Substation Ca\u00f1ada (Enlargement) [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","template":"","meta":{"_et_pb_use_builder":"off","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"project_category":[],"project_tag":[],"tipo":[8,9],"pais":[11],"estado":[45,30,17],"class_list":["post-1226","project","type-project","status-publish","hentry","tipo-lineas","tipo-subestaciones","pais-mexico","estado-aguascalientes","estado-coahuila","estado-zacatecas"],"_links":{"self":[{"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project\/1226","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/types\/project"}],"author":[{"embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/comments?post=1226"}],"version-history":[{"count":1,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project\/1226\/revisions"}],"predecessor-version":[{"id":1227,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project\/1226\/revisions\/1227"}],"wp:attachment":[{"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/media?parent=1226"}],"wp:term":[{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project_category?post=1226"},{"taxonomy":"project_tag","embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project_tag?post=1226"},{"taxonomy":"tipo","embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/tipo?post=1226"},{"taxonomy":"pais","embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/pais?post=1226"},{"taxonomy":"estado","embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/estado?post=1226"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}