{"id":1223,"date":"2021-04-15T22:15:49","date_gmt":"2021-04-15T22:15:49","guid":{"rendered":"https:\/\/www.edemtec.mx\/project\/proyecto-607-sistema-bajio-oriental-contrato-ear-edm-001-02-ear-edm-002-02\/"},"modified":"2021-05-12T23:32:34","modified_gmt":"2021-05-12T23:32:34","slug":"project-607-sistema-bajio-oriental-contract-ear-edm-001-02-ear-edm-002-02","status":"publish","type":"project","link":"https:\/\/www.edemtec.mx\/en\/project\/project-607-sistema-bajio-oriental-contract-ear-edm-001-02-ear-edm-002-02\/","title":{"rendered":"PROJECT 607 SISTEMA BAJIO \u2013 ORIENTAL. CONTRACT EAR-EDM-001-02\/EAR-EDM-002-02"},"content":{"rendered":"\n<p>Engineering, procurement, construction, tests and commissioning of the following works located in the states of Aguascalientes, Jalisco, Guanajuato and Puebla.<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>SE Aguascalientes Potencia (2 bays of 115 kV).<\/li><li>SE Encarnaci\u00f3n de Diaz (1 bay of 115 kV).<\/li><li>LT at 115 kV-2c (24 km) Santa Fe Entronque La Fraga-Jurica.<\/li><li>LT at 115 kV-2c (20 km) Santa Fe \u2013 Sn. Miguel de Allende.<\/li><li>LT 230 kV-2c (2 km) Santa Fe Entronque San Luis de la Paz II \u2013 Queretaro I.<\/li><li>LT 230 kV-2c San Luis de la Paz II \u2013 Queretaro I. Supply and installation of 90 km of guard wire Opgw.<\/li><li>SE San Miguel de Allende (2 bays of 115 kV).<\/li><li>SE Santa Fe (3 bays of 230, 5 bays of 115 kV, one bank of transformers of 225 MVA plus a reserve of 75 MVA).<\/li><li>LT at 230 kV, double circuit (installation of only one), 55 km Aguascalientes Entronque Sn. Juan de los Lagos \u2013 Teocaltiche.<\/li><li>SE Puebla II, enlargement (two banks of transformers of 375 MVA each plus a backup transformer of 125 MVA, two bays of 400 KV and four bays of 115 KV).<\/li><\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Engineering, procurement, construction, tests and commissioning of the following works located in the states of Aguascalientes, Jalisco, Guanajuato and Puebla. SE Aguascalientes Potencia (2 bays of 115 kV). SE Encarnaci\u00f3n de Diaz (1 bay of 115 kV). LT at 115 kV-2c (24 km) Santa Fe Entronque La Fraga-Jurica. LT at 115 kV-2c (20 km) Santa [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","template":"","meta":{"_et_pb_use_builder":"off","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"project_category":[],"project_tag":[],"tipo":[8,9],"pais":[11],"estado":[45,43,36,31],"class_list":["post-1223","project","type-project","status-publish","hentry","tipo-lineas","tipo-subestaciones","pais-mexico","estado-aguascalientes","estado-guanajuato","estado-jalisco","estado-puebla"],"_links":{"self":[{"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project\/1223","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/types\/project"}],"author":[{"embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/comments?post=1223"}],"version-history":[{"count":1,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project\/1223\/revisions"}],"predecessor-version":[{"id":1224,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project\/1223\/revisions\/1224"}],"wp:attachment":[{"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/media?parent=1223"}],"wp:term":[{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project_category?post=1223"},{"taxonomy":"project_tag","embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project_tag?post=1223"},{"taxonomy":"tipo","embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/tipo?post=1223"},{"taxonomy":"pais","embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/pais?post=1223"},{"taxonomy":"estado","embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/estado?post=1223"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}