{"id":1137,"date":"2021-04-15T21:20:33","date_gmt":"2021-04-15T21:20:33","guid":{"rendered":"https:\/\/www.edemtec.mx\/?post_type=project&#038;p=1137"},"modified":"2021-05-13T00:23:20","modified_gmt":"2021-05-13T00:23:20","slug":"project-contract-pif-007-2015","status":"publish","type":"project","link":"https:\/\/www.edemtec.mx\/en\/project\/project-contract-pif-007-2015\/","title":{"rendered":"PROJECT <<322 SLT 1921 REDUCCION DE PERDIDAS DE ENERGIA EN DISTRIBUCION (4A FASE)>>. CONTRACT PIF-007\/2015"},"content":{"rendered":"\n<p>Execution of all the works necessary for the construction and installation of 10 (ten) works: 6 (six) works of loss reduction with voltage of 23 kV, a total capacity of 102.42 MVA of transformation and the construction of 427.54 km-c of line; and 4 (four) works of measurement assurance. Said works imply the removal, supply and installation of 250,522 energy meters AMI type with any type of communication; located in the state of Mexico City and State of Mexico. Includes activities of engineering, supply, construction and tests.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Execution of all the works necessary for the construction and installation of 10 (ten) works: 6 (six) works of loss reduction with voltage of 23 kV, a total capacity of 102.42 MVA of transformation and the construction of 427.54 km-c of line; and 4 (four) works of measurement assurance. Said works imply the removal, supply [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","template":"","meta":{"_et_pb_use_builder":"off","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"project_category":[],"project_tag":[],"tipo":[10],"pais":[11],"estado":[24],"class_list":["post-1137","project","type-project","status-publish","hentry","tipo-reduccion","pais-mexico","estado-campeche"],"_links":{"self":[{"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project\/1137","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/types\/project"}],"author":[{"embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/comments?post=1137"}],"version-history":[{"count":3,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project\/1137\/revisions"}],"predecessor-version":[{"id":1325,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project\/1137\/revisions\/1325"}],"wp:attachment":[{"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/media?parent=1137"}],"wp:term":[{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project_category?post=1137"},{"taxonomy":"project_tag","embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/project_tag?post=1137"},{"taxonomy":"tipo","embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/tipo?post=1137"},{"taxonomy":"pais","embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/pais?post=1137"},{"taxonomy":"estado","embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/estado?post=1137"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}