{"id":1135,"date":"2021-05-10T22:16:39","date_gmt":"2021-05-10T22:16:39","guid":{"rendered":"https:\/\/www.edemtec.mx\/?p=1135"},"modified":"2021-05-10T22:24:21","modified_gmt":"2021-05-10T22:24:21","slug":"cfe-goes-with-siemens-edemtec-and-electricas-de-medellin-for-devils","status":"publish","type":"post","link":"https:\/\/www.edemtec.mx\/en\/cfe-goes-with-siemens-edemtec-and-electricas-de-medellin-for-devils\/","title":{"rendered":"CFE GOES WITH SIEMENS, EDEMTEC AND EL\u00c9CTRICAS DE MEDELL\u00cdN FOR DEVILS"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>Siemens, El\u00e9ctricas de Medell\u00edn and EDEMTEC<\/strong> will install more than 300 thousand meters in Mexico City and in the State of Mexico to combat technical and non-technical electricity losses, known as \u201cdiablitos\u201d.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For this, a contract will be made for $ 169 million 891 thousand 816 awarded by the Federal Electricity Commission (CFE). The CFE reported that the amount is below the budget, 237 million 344 thousand 528 dollars.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">EThis is equivalent to a saving of $ 67 million 452 thousand 712 compared to what was originally budgeted.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The project that includes Mexico City and the State of Mexico will enter into commercial operation in May 2018.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The CFE received ten proposals, of which eight met all the technical and legal requirements established in the call. The objective of the project is to reduce technical and non-technical losses associated with the lack of measurement of electrical energy consumption, as well as the lack of maintenance and modernization of the distribution networks.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Specifically, the scheme consists of the execution of ten works to reduce energy losses and a work to ensure the measurement, which includes the supply and installation of 378 thousand 510 Advanced Metering Infrastructure (AMI) meters. , with free communication technology; 12,874 distribution transformers with a total capacity of 162.32 megavolt amperes (MVA), as well as the installation of 1,185 circuit kilometers (km-C) of line at 23 kilovolts (kV).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Transparencia Mexicana acted as a social witness and supervised the bidding process.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The state power company has the objective of reducing the percentage of technical and non-technical losses that currently stands at 14 percent at the national level to 12 percent at the end of the six-year term.<br>In developed countries, this percentage of losses is between six and eight percent, a goal that will not be reached during the current administration.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/www.elfinanciero.com.mx\/economia\/cfe-adjudica-proyecto-para-reducir-perdida-de-energia-en-zona-centro.html\">Va CFE con Siemens, Edemtec y El\u00e9ctricas de Medell\u00edn por diablitos (elfinanciero.com.mx)<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Siemens, El\u00e9ctricas de Medell\u00edn and EDEMTEC will install more than 300 thousand meters in Mexico City and in the State of Mexico to combat technical and non-technical electricity losses, known as \u201cdiablitos\u201d. For this, a contract will be made for $ 169 million 891 thousand 816 awarded by the Federal Electricity Commission (CFE). The CFE [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":938,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"off","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[20],"tags":[],"class_list":["post-1135","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/posts\/1135","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/comments?post=1135"}],"version-history":[{"count":1,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/posts\/1135\/revisions"}],"predecessor-version":[{"id":1136,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/posts\/1135\/revisions\/1136"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/media\/938"}],"wp:attachment":[{"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/media?parent=1135"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/categories?post=1135"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.edemtec.mx\/en\/wp-json\/wp\/v2\/tags?post=1135"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}