PROJECT "214 SE 1210 NORTH - NORTHWEST" (9A PHASE) CONTRACT PIF-005/2016

Construction and Installation of 2 (two) Transformer Substations with 115 / 34.5 kv voltages, with a capacity of 30 mva and 1.8 mvar of compensation and 4 (four) feeders, and 1 (one) Power Line with voltage of 115 kv and a total length of 38.9 km-c that will be located in the state of Chihuahua of the United Mexican States. Includes engineering, supply, construction and testing activities.

Start Date: 15-apr-16
Final Date: 08-jun-17

LT. SAN PEDRO POTENCIA - CAHUISORI CONTRACT RRNE-131004

230 Kv, 91.41 Km 1c, 1113 Acsr / As, Located In The State Of Chihuahua (50%) / Cobra Facilities And Services Mexico, S.A. From C.V. (50%) Includes Engineering, Supply, Construction And Test Activities

Start Date: jun-20
Final Date: 30-apr-15

PROJECT 1601: 262 SLT 1601 TRANSMISSION AND TRANSFORMATION NORTHWEST - NORTH (1st PHASE). CONTRACT No PIF-005/2012

Engineering, Procurement Of Materials And Equipment For Permanent Installation, Training, Construction And Commissioning Of 3 (Three) Transmission Lines With Voltages Of 230 And 115 Kv And A Total Length Of 29.2 Km-C And 2 (Two) Substations With Voltages Of 230 And 115 Kv, With 133.3 Mva, 18 Mvar And 5 (Five) Feeders, Located In The State Of Chihuahua, United States Of Mexico:
LT Lopez Mateos – San Pedro Power. 230 Kv, 1 Cto, Torers Self-supporting, 21.30 Km-Line, 21.30 Km-Circuit, Acsr / As 1113, One Conductor Per Phase.
LT San Pedro Potencia Entq Cm San Pedro – Basaseachic. 115 Kv, 2 Ctos, Self-Supporting Towers, 3.70 Km-Line, 7.40 Km-Circuit, Acsr / As 477, One Conductor Per Phase
LT San Pedro Power Entq Cm San Pedro – Creel. 115 Kv, 1 Cto, Torres Self-supporting, 0.50 Km-Line, 0.50 Km-Circuit, Acsr / As 477, One Conductor Per Phase.
If San Pedro Potencia Bco. 1. 1t-3f-100 Mw 230/115 Kv 1/3; 1a 230 Kv LT Cuauhtemoc Ii; 1a 115 Kv LT Cm San Pedro; 1a 115 Kv LT Basaseachi; 1a 115 Kv LT Creel; 1 Reactor 18 Mvar In 13.8 Kv To Be Installed In The Tertiary Of The Transformer Bank.
If Cuauhtemoc Ii Ampl. 1a 115 Kv LT San Pedro Power.

Start Date: 03-feb-12
Final Date: 17-jan-13

PROJECT "244 SE 1321 DISTRIBUTION NORTHEAST" (3rd stage). CONTRACT No. PIF-018/2011

Engineering, Procurement of Materials and Equipment for Permanent Installation, Training, Construction and Available to  2 works: a Distribution Substation with voltages of 115 kv and 13.8 kv, with a total capacity of 30 mva; 1.8 mvar in medium voltage; 2 high voltage feeders and 4 medium voltage feeders; 1 work of high voltage line in 115 kv with 2,476 km-c, that will be located in the State of Chihuahua, of the United Mexican states:

► LAT Abraham González ENTQ. Boquilla – Camargo UNO. 115kV, 2 cts, 1.24 KM-L, wire of: 477 acsr; Self-supporting posts.
► SE Abraham González BC0.1 + MVAR. 1T-3F-30MVA-115 / 13.8 KV-2 / 4A + 1.8 MVAR.

Start Date: 15-dec-11
Final Date: jan-13

PROJECT 50 LT 610 TRANSMISSION NORTHWEST - NORTH (2nd PHASE). CONTRACT No. PIF-026/2006

LT Moctezuma – Nuevo Casas Grandes Ii (0.51 Km-L, 164.80 Km-C. Section 1 From SE Moctezuma To Km 0 + 510 230 Kv, 1c, Self-supporting towers, 0.51 Km-L 0.51 Km-C, Acsr / As 1113 One Conductor Per Phase, Section 2 Of Km 0 + 510 To The New Large Houses Ii, 400 Kv Initial Operation 230 Kv, 2c, Existing Self-Support Towers, 0.00 Km-L 164.29 Km-C, Acsr / As 1113 Two Conductors Per Phase Out of the 2nd Circuit.
SE Nacozari Mvar L1 + L2 (Neutral Reactor For LT New Large Houses Ii (C1) And LT New Large Houses Ii (C2).
SE Moctezuma (1a 230 Kv LT Nuevo Casas Grandes Ii (C2)
It is Nuevo Casas Grandes Ii Ampl. + Mvar (1 to 230 Kv LT Moctezuma (C2) and Single Phase Reactors, 3 X 7 Mvar).

Start Date: 08-dec-06
Final Date: 31-aug-08

PROJECT EL SAUZAL. CONTRACT 327400-SC-05-A Y 05-B

Construction Of A LT Of 115 Kv, 70 Km. In The States Of Sinaloa And Chihuahua For The Mining Project Of El Sauzal.

Start Date: 08-nov-03
Final Date: 07-sep-04