LT ANGOSTURA-TAPACHULA. CONTRACT RRPE-AD-CO-001-16

Execution Of Emergency Work For The Provisional And Definitive Rehabilitation Of The Collapsed Structures Of The Angostura-Tapachula Power Line, Ang-A3t30-Thp, 400 Kv-2c-1113 Acsr / As-Ta, Located In The State Of Chiapas.

Start date: 30-may-16
Final Date: 23-jul-16

PROJECT 211 SLT 1203 TRANSMISSION AND EASTERN-SOUTH TRANSFORMATION (1st PHASE). CONTRACT No. PIF-017/2009

Engineering, Supply, Construction, Training And Commissioning Of 9 Lt’s Of 400, 230 And 115 Kv And A Total Length Of 196.1 Km-C And 6 Se’s With Voltages Of 400, 230 And 115 Kv, With A Capacity Of 1175 Mv And 22.5 Mvar And 25 Feeders, In the Countries. From Chiapas and Veracruz.

►LT Jardin – Veracruz Ii. 115 Kv, 2 Ctos, Self-supporting Towers, 1.10 Km-Line, 2.20 Km-Circuit, One Driver Acsr / As 795 Per Phase.
►LT Jardin – Infonavit 115 Kv, 2 Ctos, Cable Underground, 0.20 Km-Line, 1.30 Km-Circuit; Type Xlpe, Copper and Cross Section 1000 Mm2 Conductive Cable Per Phase.

►LT Laguna Verde – Jamapa. 400 Kv, 2 Ctos, Self-supporting Towers, 84.70 Km-Line, 168.40 Km-Circuit, Two Drivers Acsr / As 1113 By Phase.
►LT Jamapa Entq. Veracruz Ii – Temascal Ii L1. 230 Kv, 2 Ctos, Self-supporting Towers, 2.50 Km-Line, 5.00 Km-Circuit, Acsr / As 1113, One Conductor Per Phase.
►LT Jamapa Entq. Garden – Temascal Ii L2. 230 Kv, 2 Ctos, Self-supporting Towers, 2.50 Km-Line, 500 Km-Circuit, Acsr / As 1113, One Conductor Per Phase.
►LT Jardin – Las Brisas. 115 Kv, 2 Ctos, Underground Cable, 1.30 Km-Line, 2.60 Km-Circuit; Type Xlpe, Copper and Cross Section 1000 Mm2 Conductive Cable Per Phase.
►LT Jardin – J.B. Wolves. 115 Kv, 2 Ctos, Self-supporting Towers / Cable Underground, 3.10 Km-Line, 4.80 Km-Circuit. Cable Type Xlpe, Copper And Transverse Section Of 1,000 Mm2 Per Phase And Acsr / As 795.
►LT Paso Del Toro Entq. Boca Del Rio – The Farm Iii. 115 Kv, 4 Ctos, Self-supporting Towers, 0.30 Km-Line, 1.20 Km-Circuit. Cable Driver Acsr / As 795.
►LT Jamapa Entq. Veracruz Ii – Amatlan Ii. 230 Kv, 4 Ctos, Self-supporting Towers, 1.40 Km-Line, 5.60 Km-Circuit; Conductor Cable Acsr / As 1113, One Conductor Per Phase.
►SE Jamapa Bcos. 1 and 2 7at-1f-125 Mw, 400/230 Kv 2/8; 2a 400 Kv L.T. Green Lagoon (C1 + C2); 1a 230 Kv L.T. Garden; 1a 230 Kv L.T. Veracruz Ii; 2a 230 Kv L.T. Temascal Ii; 2a 230 Kv L.T. Amatlan Ii; 2a 230 Kv L.T. Tamsa II.
►SE Paso Del Toro 1a 115 Kv L.T. Farm Iii; 1a 115 Kv L.T. Boca Del Río.
►SE Laguna Verde (Sf6) Maneuvers 2a 400 Kv L.T. Jamapa (C1 + C2); 2a 400 Kv L.T. Green Lagoon (U1 + U2); 1 to 400 Kv L.T. Puebla Ii; 1 to 400 Kv L.T. Blue Cross Maneuvers; 1 to 400 Kv L.T. Poza Rica Ii.
►SE Jardin Bco. 1 (Sf 6) 4at-1f-75 Mw, 230/115 Kv 0/6; 2a 115 Kv L.T Veracruz Ii; 2a 115 Kv L.T. Breezes; 1a 115 Kv L.T. J.B. Wolves; 1a 115 Kv L.T. Infonavit.
►SE San Cristobal Oriente Mvar Bank Of Capacitors Of 15,0 Mvar In The Level Of 115 Kv.
►SE Ocosingo Mvar Bank Of Capacitors Of 7.5 Mvar In The Level Of 115 Kv.

Start Date: 05-jun-09
Final Date: 18-mar-11

PROJECT OF OPTICAL FIBER BETWEEN SE MALPASO II - MACUSPANA POWER IS LOCATED IN THE STATES OF TABASCO AND CHIAPAS. CONTRACT 164064-023

Supply, Installation Of Equipment And Laying Of 160 Km Of Cable Opgw Of 36 Fibers.

Start Date: 12-may-04
Final Date: 11-aug-04