PROJECT "707 LINKING NORTH - SOUTH ". CONTRACT NO. PIF-007/2002

Engineering, Procurement, Construction, Testing and Implementation of the following works, located in the states of Coahuila, Zacatecas and Aguascalientes:
► Saltillo Substation (enlargement) a reactor bank of 150 MVAR and two bays of 400 kV.
► Substation May 1st (extension) a Reactor Bank of 150 MVAR and two bays of 400 kV.
► Substation Cañada (extension) a bay of 400 kV.
► LT Saltillo – First of May (second circuit installation), 230 Km, 400 kV-1c-2h / f.
► LT First of May – Cañada (second circuit installation), 220 Km, 400 kv-1c-2h / f.

Start Date: 08-jul-03
Final Date: 14-may-04

PROJECT "607 BAJÍO - EASTERN SYSTEM". CONTRACT EAR-EDM-001-02 / EAR-EDM-002-02

Engineering, Attempt, Construction, Testing And Start Up Of The Following Works Located In The States Of Aguascalientes, Jalisco, Guanajuato And Puebla.
► SE Potency inAguascalientes (2 bays of 115 Kv).
► SE Encarnación Of Diaz (A Bay Of 115 Kv).
► LT A 115 Kv-2c (24 Km) Santa Fe conected to  La Fraga-Jurica.
► LT A 115 Kv-2c (20 Km) Santa Fe – Sn. Miguel De Allende.
► LT 230 Kv-2c (2 Km) Santa Fe Conected to San Luis De La Paz Ii – Querétaro I.
► LT 230 Kv-2c San Luis De La Paz Ii – Querétaro I. Supply And Installation Of 90 Km Of Wire Opgw Guard.
► SE San Miguel De Allende (2 Bays Of 115 Kv).
► SE Santa Fe (3 Bays Of 230, 5 Bays Of 115 Kv, A Bench Of Transformers Of 225 Mva More A Reserve Of 75 Mva).
► LT 230 kV, Double Circuit (Only One Installation), 55 Km. Aguascalientes Conected to Sn. Juan De Los Lagos – Teocaltiche.
► SE Puebla LI, Extension (Two Benchs Of Transformers Of 375 Mva Each More A 125 Mva Reservoir Transformer, Two Bays Of 400 Kv And Four Bays Of 115 Kv.

Start Date: 08-nov-02
Final Date: 07-mar-04